Concrete also needs to be acid etched before you can apply epoxy. It, "I'm acid washing a concrete slab with bad "Slab Edge Dampness". This concrete had metal flakes sprinkled on while the concrete was wet, then the surface was acid etched. You can hurt yourself through carelessness and kids should be kept away while this is being done. Today, safer, eco-friendlier and more consistent etching methods are used to prepare aconcrete floor for painting. Since these products are capable of etching galvanized metal, do not use agalvanized container to mix or hold while applying. The latter is an especially good choice for first-timers because it is much less caustic and dangerous than the other acids. The acid needs to be able to touch every part of the concrete's surface to react properly with it. A marble-like effect is created, because the acid is unpredictable. DRYLOK Etch applies with astiff brush. If youre spraying, use asqueegee to move the solution around to ensure each part of the surface is equally coated. When a floor slab is poured, contractors etc often float or trowel the surface smooth by working up a smooth weak film over the concrete surface, this weak film is called latencies. At times the best situations arise from accidents. Published Wednesday 13th of July 2022 // Updated Tuesday 8th of June 2021. {"smallUrl":"https:\/\/www.wikihow.com\/images\/thumb\/6\/6b\/Acid-Etch-Concrete-Step-1-Version-3.jpg\/v4-460px-Acid-Etch-Concrete-Step-1-Version-3.jpg","bigUrl":"\/images\/thumb\/6\/6b\/Acid-Etch-Concrete-Step-1-Version-3.jpg\/aid3719357-v4-728px-Acid-Etch-Concrete-Step-1-Version-3.jpg","smallWidth":460,"smallHeight":345,"bigWidth":728,"bigHeight":546,"licensing":"
License: Creative Commons<\/a> License: Creative Commons<\/a> License: Creative Commons<\/a> License: Creative Commons<\/a> License: Creative Commons<\/a> License: Creative Commons<\/a> License: Creative Commons<\/a> License: Creative Commons<\/a> License: Creative Commons<\/a> License: Creative Commons<\/a> License: Creative Commons<\/a> License: Creative Commons<\/a> License: Creative Commons<\/a> License: Creative Commons<\/a> License: Creative Commons<\/a> License: Creative Commons<\/a> License: Creative Commons<\/a>
\n<\/p>
\n<\/p><\/div>"}, {"smallUrl":"https:\/\/www.wikihow.com\/images\/thumb\/5\/51\/Acid-Etch-Concrete-Step-2-Version-3.jpg\/v4-460px-Acid-Etch-Concrete-Step-2-Version-3.jpg","bigUrl":"\/images\/thumb\/5\/51\/Acid-Etch-Concrete-Step-2-Version-3.jpg\/aid3719357-v4-728px-Acid-Etch-Concrete-Step-2-Version-3.jpg","smallWidth":460,"smallHeight":345,"bigWidth":728,"bigHeight":546,"licensing":"
\n<\/p>
\n<\/p><\/div>"}, {"smallUrl":"https:\/\/www.wikihow.com\/images\/thumb\/b\/b6\/Acid-Etch-Concrete-Step-3-Version-3.jpg\/v4-460px-Acid-Etch-Concrete-Step-3-Version-3.jpg","bigUrl":"\/images\/thumb\/b\/b6\/Acid-Etch-Concrete-Step-3-Version-3.jpg\/aid3719357-v4-728px-Acid-Etch-Concrete-Step-3-Version-3.jpg","smallWidth":460,"smallHeight":345,"bigWidth":728,"bigHeight":546,"licensing":"
\n<\/p>
\n<\/p><\/div>"}, {"smallUrl":"https:\/\/www.wikihow.com\/images\/thumb\/9\/90\/Acid-Etch-Concrete-Step-4-Version-3.jpg\/v4-460px-Acid-Etch-Concrete-Step-4-Version-3.jpg","bigUrl":"\/images\/thumb\/9\/90\/Acid-Etch-Concrete-Step-4-Version-3.jpg\/aid3719357-v4-728px-Acid-Etch-Concrete-Step-4-Version-3.jpg","smallWidth":460,"smallHeight":345,"bigWidth":728,"bigHeight":546,"licensing":"
\n<\/p>
\n<\/p><\/div>"}, {"smallUrl":"https:\/\/www.wikihow.com\/images\/thumb\/5\/52\/Acid-Etch-Concrete-Step-5-Version-3.jpg\/v4-460px-Acid-Etch-Concrete-Step-5-Version-3.jpg","bigUrl":"\/images\/thumb\/5\/52\/Acid-Etch-Concrete-Step-5-Version-3.jpg\/aid3719357-v4-728px-Acid-Etch-Concrete-Step-5-Version-3.jpg","smallWidth":460,"smallHeight":345,"bigWidth":728,"bigHeight":546,"licensing":"
\n<\/p>
\n<\/p><\/div>"}, {"smallUrl":"https:\/\/www.wikihow.com\/images\/thumb\/4\/41\/Acid-Etch-Concrete-Step-6-Version-2.jpg\/v4-460px-Acid-Etch-Concrete-Step-6-Version-2.jpg","bigUrl":"\/images\/thumb\/4\/41\/Acid-Etch-Concrete-Step-6-Version-2.jpg\/aid3719357-v4-728px-Acid-Etch-Concrete-Step-6-Version-2.jpg","smallWidth":460,"smallHeight":345,"bigWidth":728,"bigHeight":546,"licensing":"
\n<\/p>
\n<\/p><\/div>"}, {"smallUrl":"https:\/\/www.wikihow.com\/images\/thumb\/4\/4c\/Acid-Etch-Concrete-Step-7-Version-2.jpg\/v4-460px-Acid-Etch-Concrete-Step-7-Version-2.jpg","bigUrl":"\/images\/thumb\/4\/4c\/Acid-Etch-Concrete-Step-7-Version-2.jpg\/aid3719357-v4-728px-Acid-Etch-Concrete-Step-7-Version-2.jpg","smallWidth":460,"smallHeight":345,"bigWidth":728,"bigHeight":546,"licensing":"
\n<\/p>
\n<\/p><\/div>"}, {"smallUrl":"https:\/\/www.wikihow.com\/images\/thumb\/4\/45\/Acid-Etch-Concrete-Step-8-Version-2.jpg\/v4-460px-Acid-Etch-Concrete-Step-8-Version-2.jpg","bigUrl":"\/images\/thumb\/4\/45\/Acid-Etch-Concrete-Step-8-Version-2.jpg\/aid3719357-v4-728px-Acid-Etch-Concrete-Step-8-Version-2.jpg","smallWidth":460,"smallHeight":345,"bigWidth":728,"bigHeight":546,"licensing":"
\n<\/p>
\n<\/p><\/div>"}, {"smallUrl":"https:\/\/www.wikihow.com\/images\/thumb\/3\/32\/Acid-Etch-Concrete-Step-9-Version-2.jpg\/v4-460px-Acid-Etch-Concrete-Step-9-Version-2.jpg","bigUrl":"\/images\/thumb\/3\/32\/Acid-Etch-Concrete-Step-9-Version-2.jpg\/aid3719357-v4-728px-Acid-Etch-Concrete-Step-9-Version-2.jpg","smallWidth":460,"smallHeight":345,"bigWidth":728,"bigHeight":546,"licensing":"
\n<\/p>
\n<\/p><\/div>"}, {"smallUrl":"https:\/\/www.wikihow.com\/images\/thumb\/c\/c5\/Acid-Etch-Concrete-Step-10-Version-2.jpg\/v4-460px-Acid-Etch-Concrete-Step-10-Version-2.jpg","bigUrl":"\/images\/thumb\/c\/c5\/Acid-Etch-Concrete-Step-10-Version-2.jpg\/aid3719357-v4-728px-Acid-Etch-Concrete-Step-10-Version-2.jpg","smallWidth":460,"smallHeight":345,"bigWidth":728,"bigHeight":546,"licensing":"
\n<\/p>
\n<\/p><\/div>"}, {"smallUrl":"https:\/\/www.wikihow.com\/images\/thumb\/0\/0b\/Acid-Etch-Concrete-Step-11-Version-2.jpg\/v4-460px-Acid-Etch-Concrete-Step-11-Version-2.jpg","bigUrl":"\/images\/thumb\/0\/0b\/Acid-Etch-Concrete-Step-11-Version-2.jpg\/aid3719357-v4-728px-Acid-Etch-Concrete-Step-11-Version-2.jpg","smallWidth":460,"smallHeight":345,"bigWidth":728,"bigHeight":546,"licensing":"
\n<\/p>
\n<\/p><\/div>"}, {"smallUrl":"https:\/\/www.wikihow.com\/images\/thumb\/1\/1e\/Acid-Etch-Concrete-Step-12-Version-2.jpg\/v4-460px-Acid-Etch-Concrete-Step-12-Version-2.jpg","bigUrl":"\/images\/thumb\/1\/1e\/Acid-Etch-Concrete-Step-12-Version-2.jpg\/aid3719357-v4-728px-Acid-Etch-Concrete-Step-12-Version-2.jpg","smallWidth":460,"smallHeight":345,"bigWidth":728,"bigHeight":546,"licensing":"
\n<\/p>
\n<\/p><\/div>"}, {"smallUrl":"https:\/\/www.wikihow.com\/images\/thumb\/3\/38\/Acid-Etch-Concrete-Step-13-Version-2.jpg\/v4-460px-Acid-Etch-Concrete-Step-13-Version-2.jpg","bigUrl":"\/images\/thumb\/3\/38\/Acid-Etch-Concrete-Step-13-Version-2.jpg\/aid3719357-v4-728px-Acid-Etch-Concrete-Step-13-Version-2.jpg","smallWidth":460,"smallHeight":345,"bigWidth":728,"bigHeight":546,"licensing":"
\n<\/p>
\n<\/p><\/div>"}, {"smallUrl":"https:\/\/www.wikihow.com\/images\/thumb\/2\/26\/Acid-Etch-Concrete-Step-14-Version-2.jpg\/v4-460px-Acid-Etch-Concrete-Step-14-Version-2.jpg","bigUrl":"\/images\/thumb\/2\/26\/Acid-Etch-Concrete-Step-14-Version-2.jpg\/aid3719357-v4-728px-Acid-Etch-Concrete-Step-14-Version-2.jpg","smallWidth":460,"smallHeight":345,"bigWidth":728,"bigHeight":546,"licensing":"
\n<\/p>
\n<\/p><\/div>"}, {"smallUrl":"https:\/\/www.wikihow.com\/images\/thumb\/0\/0b\/Acid-Etch-Concrete-Step-15-Version-2.jpg\/v4-460px-Acid-Etch-Concrete-Step-15-Version-2.jpg","bigUrl":"\/images\/thumb\/0\/0b\/Acid-Etch-Concrete-Step-15-Version-2.jpg\/aid3719357-v4-728px-Acid-Etch-Concrete-Step-15-Version-2.jpg","smallWidth":460,"smallHeight":345,"bigWidth":728,"bigHeight":546,"licensing":"
\n<\/p>
\n<\/p><\/div>"}, {"smallUrl":"https:\/\/www.wikihow.com\/images\/thumb\/5\/5a\/Acid-Etch-Concrete-Step-16-Version-2.jpg\/v4-460px-Acid-Etch-Concrete-Step-16-Version-2.jpg","bigUrl":"\/images\/thumb\/5\/5a\/Acid-Etch-Concrete-Step-16-Version-2.jpg\/aid3719357-v4-728px-Acid-Etch-Concrete-Step-16-Version-2.jpg","smallWidth":460,"smallHeight":345,"bigWidth":728,"bigHeight":546,"licensing":"
\n<\/p>
\n<\/p><\/div>"}, {"smallUrl":"https:\/\/www.wikihow.com\/images\/thumb\/2\/2c\/Acid-Etch-Concrete-Step-17-Version-2.jpg\/v4-460px-Acid-Etch-Concrete-Step-17-Version-2.jpg","bigUrl":"\/images\/thumb\/2\/2c\/Acid-Etch-Concrete-Step-17-Version-2.jpg\/aid3719357-v4-728px-Acid-Etch-Concrete-Step-17-Version-2.jpg","smallWidth":460,"smallHeight":345,"bigWidth":728,"bigHeight":546,"licensing":"
\n<\/p>
\n<\/p><\/div>"}. In other words, how soon does the veneer have to be attached after the wall has been etched.months? For vertical surfaces such as walls, apply the mixed or ready-to-use liquid concrete etching solution with an acid-resistant sprayer or asynthetic brush. You'll also want to give the area a good sweeping to remove accumulated dust, dirt, or grime. For horizontal surfaces, apply the etcher using aplastic garden watering can with asprinkling head or an acid-resistant sprayer. If you can see that there are parts of the floor where the acid does not seem to be evenly applied, you may need to repeat the process after using asecond application of degreaser or manual grinding to remove the grease, oil or sealer from thatspot. If not then you will want to increase the strength accordingly. "Great article, you covered it all. Acid etch procedure MUST be followed exactly as specified below for proper installation. As soon as you apply the etcher, it should start foaming. Sani-Tred Advantages Over Other Pool Repair Products, How to Seal & Repair Swimming Poolswith Sanitred, Advantages of Sani-Tred For Sealing Ponds & Fountains, Basement Concrete Waterproofing Cost Calculator, How To Repair and Resurface Concrete Steps, How To Repair or Waterproof A Pond Or Fountain, Crystalline Waterproofing Products Versus Sani-Tred, Waterproofing Options: Sani-Tred vs. Drylok, Sani-Tred Advantages for Boat Coating & Repair, Make sure the substrate is clean and free of any previous applied products and other bond breaking contaminants, sealers, etc, Reduce Muriatic Acid (same as hydrochloric acid) with water to a 10% solution. The above-mentioned DRYLOK products do not require aneutralizing solution, but if youre using another product, be sure to follow the package directions. In this case, you may need to use a mechanical solution, like a grinder, to finish etching the concrete. If you have questions about appropriate PPE for your project do not hesitate to call us. They both remove efflorescence, which appears as asalt deposit on the surface of concrete, as well as excess mortar. If the acid etch mixture is not properly mixed at a 10% solution, the solution will be to weak to properly remove concrete latencies or it may be too strong and etch the surface deeper than necessary, and soak into the concrete surface and contaminate it with a destructive, lingering, acidity after floor materials are applied. DRYLOKs Etch &Cleaner is apowdered mixture that also cleans up with water and only requires one application to properly etch asurface. To do so, one may remove the Neutralizing Solution with a shop vac, squeegee, rented water handling equipment, or pressure washer and rinse the concrete with water. When you are applying acoating of any kind to concrete, the coating must be able to adhere to the surface. 2019 KreteTek Industries Inc. All Rights Reserved. Not to mention, the strong acids can be hazardous if used improperly or if accidents occur. When youre looking up how to etch aconcrete floor for painting, its common to see muriatic acid promoted as aconcrete etching product. The result is a wonderfully unique surface. Allow the concrete to stay damp like this until the acid is applied. One gallon of DRYLOK Concrete and Masonry Etch &Cleaner covers 300 to 600square feet. If youll be etching up to any adjacent walls or other surfaces, prepare these in the same way. Instead, apply it in one section at atime using either asprayer or astiff brush orbroom. No. Scrub the acid solution: Once the solution is applied, lightly scrub it into the concrete with a push broom or long handled scrub brush. This helps to create a uniform etch of the concrete. Whether the acid etching happens before the stain, epoxy or paint is added or not, the amount of sheen or gloss is determined by the clear topcoat. 1 cup household baking soda per gallon of water, allow it to stand for at least 15 min.. Lets look at the more detailed steps of how to etch aconcrete garage floor or how to etch abasement concrete floor using these products. Please note muriatic acid is dangerous and must be diluted before use. Sign up for wikiHow's weekly email newsletter. DRYLOK Concrete and Masonry Etch &Cleaner applies with an acid-resistant sprayer or asynthetic brush. The smooth surface of un-etched concrete wont bind as strongly with sealants, and as aresult, youll see your new sealant peeling and lifting away as it fails to adhere to the surface. If the label of the product has arecommended amount of time to leave the product on, follow those instructions. Wear an acid-proof apron to protect clothing. Both products clean the surface and leave it feeling slightly rough like sandpaper, which is the way youll know the surface is properly prepared. Chemical safety glasses or goggles with face shield. Consider using apush broom to gather the water into one area and removing it with ashop vacuum. If theres no foaming action, that means there is asealer on the concrete preventing the etcher from penetrating. This can leave some of the etching solution used up before it reaches the rest of the surface. Epoxy is a polymer-based adhesive or paint that has a plastic feel to it. This article has been viewed 266,300 times. The longer the acid is left on the surface, the more porous the concrete becomes. One of the main reasons for needing to know how to etch aconcrete floor for painting is because of laitance. Muriatic acid is the type of acid that is typically used for etching concrete. Then, use asprayer with water so that the entire surface of the concrete to be etched is damp but no puddles are present. If you're unsure of whether you have the right type of acid, check the label on its packaging most suitable products will mention that they can be used for concrete etching purposes. Sometimes a ratio stronger than 3:1 may be needed for particularly dense concrete or a smooth power {troweled} floor. If you don't immediately see bubbles, your mixture probably isn't strong enough. The floor needs to stay damp the entire time you are etchingdont let the solution dry on the floor. Before you begin, make sure you have enough acid etching product to complete the job. DRYLOK has developed safer and more effective etching products. When there is too much moisture in the concrete, the laitance mixture can look milky. Copyright 2022 All rights reserved. Never use "straight acid" mixtures for this reason. Again, muriatic acid can be dangerous - be sure to take the proper precautions. This concrete floor was acid etched and then painted with a low-sheen paint, creating a matte look, and a topcoat was not used. Take care while pouring your powdered solution into the water by using rubber gloves and eye protection. Be sure that you have washed away all traces of the oil, grease and degreaser. Use a sprayer or watering can to evenly distribute that acid and let it sit for 2-15 minutes or until it stops bubbling. Alternatively, if you're working in a garage, you may be able to simply rinse your neutralized solution directly out of the garage and into a drain. To use the powder Etch &Cleaner, dissolve the entire 12-ounce container in 1gallon of warm water in aplastic containernever use ametal container as high volumes of product can corrode the container. Remember to particularly heed the advice on handling acids. Before acid etching, make sure the concrete is free of all oil, contaminants, grease, and dirt. Contrary to what many people think, acid will not clean grease and oil spots. In fact, if these areas have not been cleaned and degreased properly, the acid solution will just sit on top and not react with the concrete. ">, 2022 United Gilsonite Laboratories | All Rights Reserved. { $refs.headerSearchInput.focus() }); If you accidentally pour acid into the first container first, you can pour water into the second container and then transfer the acid to it to easily correct for your error. Acid etched concrete floors will provide an approved surface in which to produce a penetrating and permanent bond for the Sani-Tred products. When rinsing off the etching solution, make sure it doesnt splash on other objects or nearby greenery that you dont want damaged. wikiHow is where trusted research and expert knowledge come together. Allow newly poured concrete to cure for a minimum of 28 days before etching. When the etching solution has completed its work, hose it off completely. Days? It should begin bubbling and fizzing immediately. This operation is not a video game. Read more to learn how to stain or paint the concrete after its been etched. Avoid washing your etching solution down any city drains, as disposal in this manner could be against the law. ", application of final product. The acid etching solution can be poured out, distributed using a squeegee, and agitated the surface using a push broom. The liquid, ready-to-use DRYLOK Etch &Cleaner requires no mixing. wikiHow marks an article as reader-approved once it receives enough positive feedback. By signing up you are agreeing to receive emails according to our privacy policy. Were here to ensure your success. DRYLOKs Concrete and Masonry Etch &Cleaner is aready-to-use liquid that has no harmful fumes, and its sulfamic acid formulation is safer than muriatic acid and easily cleans up with water. Read all label instructions before application and wear the proper safety gear when applying. The floor needs to stay wet the entire time you are acid etching. The purpose for acid etching is to remove latencies from the surface of concrete floors. Apply the acid etching solution over the concrete and agitate using a push broom until foaming action stops. Allow the etching solution to remain on the concrete until the foaming stops. After acid etching and rinsing, the concrete should be neutralized otherwise the concrete will be left and acidic contamination which will inhibit PermaFlex from adhering permanently. The industrial look of this floor was created with an acid stain and the stubborn leftover adhesive from the original flooring. Without proper surface prep, you could end up with acoating that flakes or rubs off much sooner than it should. The object of etching the concrete with muriatic acid and water is to have the liquid come into contact with the substrate. Some etching products require aneutralizing solution to complete the process. Then, mix 3 or 4 parts water with 1 part muriatic or hydrochloric acid in a plastic bucket.
Sitemap 1